Yinshan Copper Mine Project

Project Profile

Work Description: Construction of Deep Shaft at Yinshan Copper Mine (Section I)

Owner: Jiangxi Copper Corporation

Commenced in: March 2015

Yinshan Project locates in Dexing City, Jiangxi Province, where JCHX is tasked with technological upgrading for expansion in deep zone and pilot mining of 8000t/d project at Yinshan Copper Mine. During the sinking and lining of deep multi-function shaft, monthly sinking rate was over 100m for three consecutive months, and 100% satisfaction was achieved in terms of quality upon acceptance of works.

Mining process and technique were constantly optimized during pilot mining with long-hole drill & blast method, which laid a foundation for subsequent works. In Nov 2018, monthly production development surpassed 10000 m³ while monthly development with AA010 drilling jumbo reached 450.5m, breaking record.

In January 2019, shaft tower was completed with installation and equipping officially commenced for multi-function shaft at Yinshan Mine. On 20 June 2020, the ore passing and crushing facilities of multi-function shaft was accepted by the Owner with 100% satisfaction.

The designed capacity is 2.8mtpa, with the orebody accessed by decline and shaft. Sublevel open stoping with backfilling and shallow-hole shrinkage mining methods are applied. In 2023, JCHX was awarded the works of transiting from open pit mining to underground mining, with a designed capacity of 5000tpd, and the works are being carrying out smoothly.