Project Profile
Word Description: Contract Mining at 8# & 10# Orebody of Qilinchang Block of Huize Lead & Zinc Mine of Yunnan Chihong Zinc & Ge Mining Corporation
Owner: Yunnan Chihong Zinc & Ge Mining Corporation
Commenced in: May 2002
Huize project was established in May 2002. Current scope of work for JCHX include underground mining production at 8#, 10# ore body of Qilinchang Block, mining and capital development at 1# oxide deposit, comprising of lateral development at 924mL. The 3# shaft constructed by JCHX is the deepest one in China for the time being, and multiple national records were created during the sinking process.
The production is progressed at a capacity about 420ktpa with annual development and excavation of 93516 m3. The project was honored as “Excellent Safety Work Organization” for multiple times, and Mr. Deng Chuankui was honored as “National Excellent Foreman” in 2018.
#3 shaft is 1526.5m deep, which was the deepest shaft in China at its completion and set multiple shaft sinking records in China.













