On March 13, 2017, after a fierce competition with several well established contenders, JCHX won the bid for“Capital Works and Sinking of Ventilation Shaft at Jinfeng (Lannigou) Gold Mine”, which is the third projects that JCHX has won in only half of March in 2017.
The project is located in Zhenfeng County of southwestern part in Guizhou Province. This region is usually referred to as “Barrier in Southwest”and“Lock/Key between Yunnan & Guizhou”. It is where the most of Carlin-Type primary gold with high difficulties in mining and processing that are among the earliest developed, explored and controlled reserves in China. Zhenfeng County is located in the North East of this prefecture, with rich mineral resources such as gold, antimony, coal, iceland spar, magnesium, palladium and thallium. The developed super large gold mines – Lannigou Gold Mine and Shuiyindong Gold Mine boast respectively 60 and 15 metallic tons, with reserves reaching over 200 metallic tons. The client of this bid is Jinfeng Mining Co. Ltd.
Upon acquiring the enquiry document, leadership of JCHX attached great importance, and carefully planned the bidding process. All staff taking part in the bidding process studied carefully the enquiry documents, laid down a thorough work schedule and carefully organized the flow. A high quality bidding document with high efficiency was prepared through days of hard work. In the end, relying on its high reputation, abundant experiences, uncontested strength together with reasonable quotation, JCHX gained the favor from the client and won the bid without a hitch.
Winning this bid is a result of teamwork from all personnel from different departments and levels blessed with the right decisions from the leadership. It’s another confirmation to the comprehensive strength and brand image of JCHX. It also has significant implications to the business development in the South Western China, and adequately displayed the core competitiveness of JCHX.













