Dikulushi Copper Mine

Project Profile

  • Project Type : JCHX Self-Owned Resource Project (

  • Location : Southeastern Katanga Province, DRC

  • Commissioning Date : December 2021

Resource Base & Tenement : Located in the southeastern Katanga Province of the DRC, the project holds a mining right area covering 68.77 square kilometers. The total estimated resources stand at approximately 80,000 tonnes of contained copper. Specifically, within the PE606 mining right area, the Dikulushi deposit contains an estimated ore volume of 1.13 million tonnes. The mine successfully commenced production in December 2021.

Operational Optimization & Upgrades : Throughout 2023, the Dikulushi Copper Mine continuously optimized its stoping techniques  and successfully completed the technical upgrade of its cemented backfill system . Consequently, the mine successfully achieved all its major annual targets, including mined and processed ore volumes, recovery rates, and total metal output.

Production & Financial Performance :

  • 2023 Performance:

    • Production: Produced approximately 9,777.49 tonnes of copper equivalent in copper concentrate.

    • Sales: Sold approximately 10,201.52 tonnes of copper equivalent in copper concentrate.

    • Revenue: Generated a total sales revenue of RMB 506.10 million from copper concentrate.

  • 2024 Outlook & Achievement: All production and operational activities advanced in a highly orderly manner, successfully accomplishing the annual production and sales targets for the year.

项目展示