Lubambe Project

Project Profile

  • Client: Lubambe Copper Mine Limited

  • Established : April 2017

  • Location : Chililabombwe, Copperbelt Province, Zambia

Project Overview: Located in the renowned Copperbelt Province of Zambia, the project is situated in the town of Chililabombwe, approximately 25 kilometers north of Chingola, and in close proximity to the border between Zambia and the Democratic Republic of the Congo (DRC).

Engineering Scope & Current Operations: JCHX has successfully completed the capital development and partial stope preparation for five declines at the Lubambe Copper Mine. Currently, the project team is entrusted with the ongoing development and mining operations specifically within the areas of Decline No. 1 and Decline No. 2.

Technical Specifications:

  • Design Capacity: 2.5 million tonnes per annum (2.5 Mtpa)

  • Development System: Decline development