Jinse Project

Project Profile

  • Client : Rakita Exploration d.o.o. (Serbia Zijin Mining d.o.o.)

  • Established : April 2019

  • Location : Serbia

Strategic Significance & Project Overview : Located in Serbia, the project operates within the world-renowned Timok Copper-Gold Mine. As JCHX’s inaugural project in Europe, the Jinse Project bears the critical mission of spearheading the company’s future expansion in the European market. Committed to the core principles of “Safety First, Quality Based,” the project team is dedicated to accelerating progress and enhancing efficiency, thereby laying a solid foundation for JCHX’s global internationalization strategy.

Engineering Scope : The project company is entrusted with a comprehensive scope of highly technical underground works, including:

  • Sinking and lining of the return ventilation shaft

  • Level development and stope preparation at the -20m, -80m, -160m, -200m levels and below

  • Large-diameter long-hole (LDLH) mining and stope backfilling operations

Technical Specifications :

  • Design Capacity : 4.95 million tonnes per annum (4.95 Mtpa)

  • Mining Methods : Drift-and-fill mining method  & Large-diameter long-hole stoping with delayed backfill 

  • Development System: Combined system of shaft, inclined conveyor shaft, and decline

Intelligent Mechanization & Equipment Fleet : The project utilizes a highly advanced, fully mechanized trackless equipment fleet, featuring:

  • Boomer 282 face drill jumbos

  • Underground multi-purpose utility vehicles

  • LHD loaders and mining trucks 

  • Computerized cable bolting rigs and rock bolting rigs 